THE EXISTING INTERIOR WHEN OUR CLIENTS BOUGHT THE PROPERTY WAS DECORATED/STYLED ACCORDING TO THE STYLE OF THE ERA, SUCH AS THE WINDOW TREATMENTS THROUGH OUT THE HOUSE WERE HEAVY DRAPES WITH PADDED PELMETS WHICH COVERED ALMOST HALF OF THEIR NARROW TALL ORIGINAL WINDOWS WHICH DARKENED THE ROOMS.
THE EXISTING BATHROOMS AND KITCHEN CABINETS WERE DESIGNED IN A MORE TRADITIONAL STYLE, THE FRONTS OF THESE CABINETS WERE LACQUERED PANELLED WITH SMALL CHROME FURNITURE DOOR KNOBS TO THE BATHROOM CUPBOARDS.
THE BATHROOM’S WALLS WERE TILED UP TO ABOUT 1100MM HIGH THEN THEY WERE PAINTED PLASTERBOARD ABOVE THE TILES. THE BATH IN THE EN-SUITE WAS BUILT-IN WITH CREAM COLOURED TILE SURROUND. THE VANITY BENCH TOP WAS A “PEACH” COLOURED STONE.
OTHER THAN THE EXISTING JOINERY LOOKED A LITTLE TIRED, OUR CLIENTS ALSO WANTED TO PUT THEIR SIGNATURE IN THEIR NEW HOME, WHICH IN THIS CASE THEY CAME TO US TO RENOVATE THE INTERIOR.
THE ORIGINAL PLANS WERE MAINLY TO UPDATE THE FRONTS OF THESE CABINETRY AS OUR CLIENTS HAD ONLY 120 DAYS FOR THE WHOLE RENOVATION PROCESS BEFORE THEY HAD TO MOVE IN.
THE BRIEF THEN EVOLVED DURING THE DESIGN STAGE, AND THEY WANTED TO START EVERYTHING FROM A FRESH BLANK CANVAS.
THERE WERE 3 BATHROOMS, 4 BEDROOMS, AN OPEN PLAN LIVING-DINING-KITCHEN, A FORMAL LIVING ROOM, A STUDY ROOM AND A READING/TV ROOM THAT WE HAD TO DESIGN, AND DOCUMENT INCLUDING THE BUILDERS TO MANUFACTURE AND CONSTRUCT ALL THE NEW CABINETRY FOR ALL THE BATHROOMS, INCLUDING OTHER ROOMS AND KITCHEN WITHIN THE GIVEN TIME.
THANKS TO OUR CLIENTS THAT THEY UNDERSTOOD THE DESIGN PROCESS AND ONCE THEY HAVE MADE A DECISION, THEY WOULD THEN STICK WITH IT THROUGH OUT THE PROCESS WHICH MAKES THE EXERCISE GO QUITE SMOOTHLY AND QUICKLY AND THEY WERE AWARE WITH THE NARROW TIME FRAME.